Studio Matrx Monthly · Volume 1 · Issue 2 · July 2026
Amogh N P
 In loving memory of Amogh N P — Architect · Designer · Visionary 

Interactive Calculator · 2026

STP Cost Estimator

Estimate the capital cost of a sewage treatment plant from its capacity and technology. Enter the size in KLD, pick the treatment process, and get the indicative capex — plus the cost per KLD that lets you compare quotes.

Estimated capital cost (MBBR)Rs 0Rs 0 per KLD for a 100 KLD plant

Estimated capex by technology at 100 KLD (Rs, lakh)

1

Plant details

Design flow in kilolitres per day.

≈ Rs 18,000 per KLD (base civil + M&E).

Estimated capital cost
Rs 0
Cost per KLD
Rs 0
Technology
MBBR

Capex by technology at 100 KLD

Same capacity, different processes — MBBR is highlighted. Higher-grade effluent (MBR) costs more per KLD than a basic ASP or extended aeration plant.

Estimated capital cost, Rs (L = lakh)

How this is calculated

  • Base rate = Rs 18,000 per KLD for MBBR.
  • Capital cost = capacity × base rate × 1 = 100 × 18,000 = Rs 18,00,000.
  • Cost per KLD = capital cost ÷ capacity = Rs 18,000 per KLD.

Indicative budgetary figures for concept planning. Actual cost depends on site conditions, effluent standards, automation, brand of equipment and civil scope — obtain vendor quotations before procurement.