STP Electricity Consumption Calculator

Estimate the power a sewage treatment plant draws and what it costs to run. Enter the plant capacity, its specific energy and your electricity tariff — get daily energy plus the monthly and annual bill.

Energy consumption (per day)0 kWh/dayRs 0 a day for a 200 KLD plant

Electricity used per day → per month → per year

1

Your plant

Design flow in kilolitres per day (1 KLD = 1 m³/day).

Commercial power tariffs in India run ≈Rs 7–10 per unit.

0.8 kWh/m³

Energy used to treat each cubic metre. SBR/MBBR plants ≈0.6–0.9; MBR and small STPs run higher.

Energy per day
0 kWh
Electricity cost / month
Rs 0
Electricity cost / year
Rs 0

Energy consumption over time

A 200 KLD plant at 0.8 kWh/m³ draws about 160 units a day — here is how that scales up.

Electricity is the single largest running cost of an STP — pumps, blowers and the aeration system run around the clock. Cutting specific energy even slightly compounds fast at the annual scale.

Unit cost of treatment ≈ Rs 6.4 per m³ treated at the current tariff.

How this is calculated

  • Energy per day = capacity × specific energy = 200 × 0.8 = 160 kWh/day.
  • Cost per month = energy/day × 30 × tariff = 160 × 30 × Rs 8 = Rs 38,400.
  • Cost per year = energy/day × 365 × tariff = 160 × 365 × Rs 8 = Rs 4,67,200.

Indicative energy budgeting for concept planning. Actual draw varies with technology, load factor, standby equipment and power factor — confirm with a qualified consultant before procurement.