Amogh N P
 In loving memory of Amogh N P — Architect · Designer · Visionary 
Professional Tool

Interior Snag Checklist

Professional handover inspection checklist — 10 categories, 60+ checkpoints. Mark Pass/Fail, add remarks, download a branded PDF report.

0

Pass

0

Fail

0

N/A

54

Pending

0%

Inspected

Project Details

🏠

General

Overall finish quality

Consistent finish across all rooms

No visible defects at eye level

Matches approved design/sample

Cleaning

All surfaces dust-free

No cement/paint stains on fixtures

Glass and mirrors streak-free

Floor cleaned and polished

Alignment

All vertical lines plumb

Horizontal lines level

Symmetry maintained where designed

Edges

No sharp edges exposed

All laminates sealed at edges

Corner guards where specified

Silicone finish

Clean bead — no gaps or bubbles

Consistent width throughout

Colour matches surroundings

Applied at all wall-counter/wall-cabinet junctions

🪵

Carpentry & Modular

Wardrobe shutters

Open and close smoothly

Aligned with even gaps (2-3mm)

No warping or bowing

Handle/knob firmly fixed

Hinges

Soft-close working on all doors

No sagging — door stays where opened

Brand matches BOQ (Hettich/Hafele/Blum)

No squeaking

Drawer channels

Full extension without jamming

Soft-close engages properly

Drawer box straight — no tilting

Can hold 20kg+ without sagging

Edge banding

No peeling or lifting

Flush with surface — no lip

Colour matches laminate

Applied on all exposed edges (top, bottom, sides)

Internal finish

Laminate or matching finish inside all units

No raw/exposed plywood/MDF visible

Shelves properly supported

Clean — no sawdust or debris inside

Back panels

HDF/plywood back — not cardboard

Properly fixed — no gaps at edges

No bowing inward

Loft units

Accessible — can open from ground

Hydraulic/gas lift mechanism works

Supports weight (store test with 10kg)

Properly anchored to wall

🍳

Kitchen

Cabinets

Base units level and plumb

Wall units firmly anchored

No wobble or movement

Carcass material matches BOQ (BWP/HDHMR)

Shutters

All shutters open freely

Consistent gaps between doors

Finish matches approved sample

No chips or scratches

Hardware

All soft-close working

Pull-outs extend fully

Corner solutions (carousel/magic corner) rotate smoothly

Brand matches BOQ

Sink installation

No leak at drain connection

Silicone seal around sink edge

Mixer tap operates smoothly (hot + cold)

Waste coupling connected to drain

Chimney ducting

Duct connected to exterior (not recirculating)

No vibration or excessive noise

Auto-clean function works (if applicable)

Lighting works

Countertop

No chips or cracks

Joints sealed (if any)

Overhang consistent (20-40mm)

Support brackets at overhangs >300mm

Level — water doesn't pool

Backsplash

Fully grouted — no gaps

No hollow tiles (tap test)

Sealed at countertop junction

Clean — no adhesive marks

Electrical

Switchboards

All switches operate correct points

Plate flush with wall — no gap

No loose switches

Labeling matches if labelled

Light fixtures

All lights turn on/off properly

No flickering

Colour temperature as specified (3000K/4000K)

Positioned as per plan (centred/aligned)

LED strips

Even glow — no dark spots

Proper diffusion (no individual LED dots visible)

Dimmer works (if specified)

No visible wiring or transformer

Fan points

Hook/mount in RCC slab (NOT in false ceiling)

Fan balanced — no wobble

Speed regulator works all levels

25mm gap between fan rod and false ceiling

Power sockets

All 5-amp and 15-amp sockets working (test with device)

USB sockets working (if specified)

Socket positions match furniture layout

No reverse polarity (use tester)

Earthing

RCCB trips when test button pressed

Earthing resistance <1 ohm (get certificate)

All metal fixtures connected to earth

MCB labeling matches circuits

🎨

Ceiling & Paint

Ceiling finish

Smooth — no undulations visible at grazing light

No cracks at joints (tape + compound properly done)

Level — no sagging

Access panels provided where needed (AC, junction box)

Cove lighting

Even glow — no hot spots or shadows

Cove gap consistent (100-150mm from wall)

LED strip properly concealed

No visible wiring or connectors

Paint finish

Uniform colour — no shade variation between walls

No brush marks, roller marks, or drips

Consistent sheen (matte/satin as specified)

Clean edges at corners, switches, and frames

Corners

Sharp, clean corners — no wavy lines

Internal corners smooth (no bulging plaster)

External corners protected (corner beads where specified)

Wall edges at junctions

Clean line where wall meets ceiling

Clean line where two paint colours meet

No paint on ceiling from wall painting

Shadow gap clean (if designed)

🚪

Doors & Windows

Doors

Open and close smoothly — no scraping on floor

Self-closing hinge works (if specified)

Gap at bottom consistent (8-10mm)

No warping — lies flat when closed

Finished on both sides — no raw edges

Door locks

Lock and latch operate smoothly

Key works from both sides

Deadbolt engages fully

Handle firm — no wobble

Window shutters

Open, close, and lock properly

Rubber gasket/seal intact (no air gap)

Mosquito mesh slides freely (if provided)

No water entry during rain (check seal)

Glass panels

No scratches or cracks

Tempered glass where required (bathroom, balcony)

Silicone seal complete around edges

Clean — no adhesive residue

Sliding systems

Glide smoothly without force

Track clean — no debris

Stopper prevents door from jumping off track

Lock mechanism works

🚿

Plumbing

Faucets

Hot and cold both work

No drip when closed fully

Flow rate adequate

Brand matches BOQ (Jaquar/Grohe/Kohler)

Wash basin

Level — water drains completely

No leak at waste coupling

Overflow works

Silicone seal at wall junction

Shower

Rain shower + hand shower both work

Diverter switches properly

Adequate pressure

No leak at wall connection

WC installation

Flush works — full and half flush

Concealed cistern — no leak

Seat cover hinges firm

Silicone seal at floor junction

No wobble — firmly bolted

Drainage

All floor traps drain quickly (pour water test)

No pooling — correct slope toward drain

Trap has water seal (no sewer smell)

Drain cover sits flush with floor

Waterproofing

No damp patches on ceiling below bathrooms

Silicone around all pipe penetrations

Threshold hump prevents water from exiting bathroom

Flood test done before tiling (48 hours — ask for certificate)

🏗️

Flooring

Tiles

No hollow tiles (tap with coin — listen for hollow sound)

No chipped corners or edges

Pattern/direction consistent across room

Colour consistent — no shade variation between lots

Tile joints / grout

Grout lines consistent width throughout

Grout fully filled — no gaps

Colour consistent

Waterproof grout used in wet areas

Leveling

Floor level — no lippage between tiles

Slope toward drain in wet areas (pour water test)

No undulations visible at grazing light

Threshold level transition between rooms

Skirting

Flush with wall — no gap

Height consistent throughout

Joints mitered at corners

Silicone at top edge if specified

🛋️

Furniture

Sofa / loose furniture

Fabric/leather matches approved sample

Frame solid — no creaking

Cushions firm and even

Legs stable — no wobble

Beds

Headboard firmly mounted

Storage mechanism works (hydraulic/drawer)

No sharp edges

Mattress fits properly — no gap at edges

Tables

Level surface — glass of water doesn't slide

Finish matches sample

Legs stable on floor

Edge treatment smooth

Mirrors

Firmly mounted to wall

Level — reflection is straight

No dark spots or distortion

Edges finished (bevelled/polished)

🔑

Final Handover

BOQ verification

All items in BOQ delivered and installed

Material brands match BOQ specification

Quantities match — no shortfall

Any variation orders documented and signed

Warranty documents

Kitchen modular warranty card received

Hardware warranty (Hettich/Hafele) card received

Countertop warranty (if quartz/Corian)

Appliance warranties collected and registered

Appliance manuals

All appliance user manuals collected

Installation certificates for chimney, hob, oven

Service contact numbers documented

Keys / access

All door keys received (minimum 2 sets)

Window keys received

Smart lock access codes set up (if applicable)

Gate remote / intercom access configured

Snag rectification

All snag items from this checklist addressed

Rectification verified and signed off

Timeline for pending items documented in writing

Retention amount held until all snags resolved

Download Snag Report PDF

Branded PDF with project details, all items, Pass/Fail status, and remarks. Share with contractor for rectification.