Studio Matrx Monthly · Volume 1 · Issue 5 · October 2026
Amogh N P
✦ In loving memory of Amogh N P — Architect · Designer · Visionary ✦

Utilities & Downloads

Interior Project Timeline Planner

Professional 4-sheet planner — Gantt chart, contractor coordination, and AI-assisted delay prediction. Created by Amogh N P.

Excel File
📅 Planned end: 7 Feb 2027⚠️ Predicted delay: 11.6 days📆 Adjusted end: 19 Feb 2027✅ Progress: 0/10 tasks

About This Tool

This planner was designed by Amogh N P — architect and creator of Studio Matrx — to help homeowners and designers manage interior projects professionally.

📊

Gantt Timeline

Pick a project-scope preset (Quick refresh / Standard / Full renovation) — all 10 phase durations rescale proportionally. Watch the time-share donut and weeks-per-phase bar update, then track status per task.

🔧

Contractor Coordination

Enter planned and actual start/end dates for each trade contractor. The tool automatically calculates delay days so you can track accountability.

⚠️

Delay Prediction

Adjust the probability and control strength sliders for each risk factor. The tool calculates residual probability and predicted delay days, giving you a realistic adjusted project end date.

Download Options

Use Download PDF for a branded summary to share with your designer or contractor. Use Excel File to get the original spreadsheet with formula-driven Gantt bars.

Disclaimer: This project timeline tool is provided by Studio Matrx – DesignAI for planning purposes only. All durations and risk predictions are indicative estimates. Actual timelines depend on site conditions, vendor availability, client decisions, and other factors. This tool does not constitute a professional project management contract. Always work with a licensed professional. Studio Matrx is not liable for decisions made based on this tool. Governed by the laws of India — Courts of Karnataka.

← Back to Utilities

Multi-vendor coordination · Indian projects

Gantt chart on a designer's monitor for an Indian interior project

Gantt · Indian project

Weekly project review meeting with multiple Indian vendors

Weekly · site meeting

Designer coordinating Indian site vendors on WhatsApp group

Daily · WhatsApp

Designer doing handover walkthrough with the homeowner

Handover · walkthrough

Coordinate the project end-to-end

DesignAI aligns design concepts with your project Gantt + vendor coordination plan.

Use in DesignAI