Utilities & Downloads
Interior Contract Template
India — Legally Refined Version
Fill in the blanks — parties, payment milestones, timeline, warranty, and jurisdiction. Score the contract risk. Download a complete, ready-to-review legal agreement PDF.
Parties
CLIENT
DESIGNER / CONTRACTOR
GST & Contract Value
Payment Milestones
Timeline & Warranty
Dispute Resolution & Project Type
Risk Scoring — Pre-Signing Evaluation
Rate each parameter 1 (Low Risk) to 5 (High Risk) based on the contract you are reviewing.
Scope Clarity
Is the SOW room-wise and detailed?
BOQ Specificity
Are brands, grades, and finishes specified?
Payment Structure Risk
Are milestones linked to stages (not advance-heavy)?
Timeline Clarity
Are start date, duration, and penalties defined?
Warranty Transparency
Are warranty periods per component specified?
Brand Substitution Risk
Is written approval required for any substitution?
Download Contract PDF
Portrait PDF — complete agreement with all filled fields, Annexure A BOQ format, risk scoring, and signature blocks.
Have a qualified legal professional review before signing.
From draft to signed — what each stage looks like





Let DesignAI produce the scope your contract references
Room-wise BOQ, IS-coded material specs, layout drawings and 3D renders — generated from your floor plan in minutes. Attach to Schedule A of this contract.
Try DesignAI free →Related Guides — Deep-dive reading
Design/Build vs. Hiring Separately: What Indian Homeowners Should Know
The procurement-model decision behind every home project — one turnkey firm that designs and builds, or an independent designer and a separately appointed contractor — and how to choose the one that fits your time, budget, and appetite for control.
Planning Your ProjectDoor Fitting Contract: Work Order & Terms India 2026
What a clear door fitting agreement covers — scope, rate basis, advance and payment, timeline, defect liability and snag rectification — with a simple work-order template.
Home Doors & EntrancesHome Renovation Red Flags
The warning signs in a quote, contract, or site that predict a renovation gone wrong
Mistakes & PitfallsRelated Tools — You may also find these useful
Interior Contract Clause Checklist
16 sections and 98 checkboxes covering scope, BOQ, milestones, penalties, warranty, and disputes.
Contract ChecklistContract Studio
AI generates professional architecture service agreements with milestones and scope.
ArchitectAIInterior Red Flag Checklist — Before Signing
54 red flags across 8 categories with a live risk score and personalised PDF.
Red Flag Checklist