Model, Process, PeopleLesson 1.3
Building Information Modelling/Module 1 · What BIM Really Is

Lesson 1.3 · What BIM Really Is

Model, Process, People

BIM is three things at once — and the software is the least of them

12 min Interactive lessonFree · open lessonByAmogh N P· Architect & interior designer
The hook

A firm buys the software, trains no one, agrees nothing — and wonders why BIM failed.

It is the most common BIM failure story in the industry, and it is always the same. A practice buys the licences, installs them, and expects BIM to arrive. Six months later they have expensive 3D drawings, no coordination, no reliable data, and a conclusion that 'BIM does not work for us'.

The software was never the problem, because the software was never the point. BIM stands on three legs — a model, a process and people — and a stool with one leg does not stand. The model is the information. The process is how that information is asked for, made, checked and handed over. The people are the roles and the collaboration that carry it. Buy only the software and you have bought one third of one leg.

One leg is a pogo stick. Three legs are a stool. BIM needs the stool.

The model is only one leg

It is easy to think BIM *is* the model — the thing you see on screen. But the model is only the artefact. Around it sit two things without which it delivers almost nothing.

The process is the way of working: the client states what information they need; the delivery team plans how they will produce it; everyone works in one shared, controlled place; the information is checked before it is trusted; and it is handed over in a usable form at the end. The people are the roles and relationships that make this happen — who is responsible for what, who checks whose work, who talks to whom, and the agreements that bind them. Software sits *inside* the process, as one of the tools people use. It is real and necessary — but it is the smallest of the three legs, and the one that matters least to whether BIM succeeds.

BIM MODEL the information PROCESS require, share, check, hand over PEOPLE roles & collaboration software = one tool here
Zoom
BIM stands on three legs — the model, the process and the people. Software is one tool inside the process leg. Remove any leg and the stool falls: that is why buying software alone is not doing BIM.

The process: information has a lifecycle

Information in BIM is not produced in a heap; it flows through a lifecycle, and the process is what gives that flow shape and repeatability. The client (or 'appointing party') states their information requirements — what they need, to what standard, by when. The delivery team writes a plan for meeting them (a BIM Execution Plan). Everyone produces their work in a single shared, access-controlled place — the Common Data Environment — where information moves through clear states (work-in-progress, shared, published). The information is checked and validated before anyone relies on it. And at the end it is handed over as a structured asset the owner can actually use.

This is what the international standard ISO 19650 codifies (Module 5 covers it properly). The point for now is simpler: BIM is a *managed flow of information*, and the management — not the modelling — is where most of the value and most of the risk live.

THE INFORMATION LIFECYCLE REQUIREEIR PLANBEP PRODUCEin the CDE CHECKvalidate HANDOVER a managed flow, not a heap - repeatable because it is a process
Zoom
The process is a managed information lifecycle: the client requires, the team plans, everyone produces in the shared Common Data Environment, the work is checked, and it is handed over. ISO 19650 codifies this flow.

You cannot buy BIM. You can only buy one of its tools, and then do the work.

The people: BIM is a team sport

A perfect model built by one person in a silo still fails, because BIM's core value — coordination, reliable shared information, a clean handover — is inherently collaborative. It only works when many parties model, share and check *together*, to common rules.

So BIM is organised around roles. Formally, there is the appointing party (the client), the lead appointed party (who coordinates delivery), and the task teams (each discipline). Practically, teams also carry BIM-specific roles: a BIM manager who sets and governs the standards and the CDE, a BIM coordinator who runs clash detection and keeps the federated model honest, and modellers who build to the agreed rules. None of this is about software features; it is about people knowing their responsibilities and working to a shared method. Get the people and their agreements right and mediocre software still delivers BIM; get them wrong and the best software delivers expensive chaos.

The worked example

Three altitudes on the same idea

Read the band that fits you — or all three.

StudentLearn the idea

Learn the three legs. BIM = MODEL (the information you build) + PROCESS (how it is required, produced in a shared place, checked and handed over) + PEOPLE (the roles and collaboration that carry it). Software is one tool inside the process — necessary, but the least decisive of the three. Remember the stool: remove any leg and it falls over. This is why 'we bought the software' is never the same as 'we do BIM'.

PractitionerDo it on a project

Feel it in your week. Most of your BIM day is actually the *process*: you work inside the shared environment (the CDE), you model to meet the client's information requirements, you follow the agreed plan (the BEP), and you check before you publish. Your value is not the buttons you know — it is modelling correctly, to the shared rules, and collaborating cleanly with the other disciplines. The software is assumed; the discipline is what is scarce.

BIM LeadDecide & govern it

Decide it as a system. Adopting BIM is 10% buying tools and 90% designing a way of working: what information do we require, in what standard, checked by whom; what is our CDE and its workflow; who holds the BIM-manager and coordinator roles; what do our appointments and the BEP actually commit each party to. Budget for training, standards and role definition — not just licences. On Indian government projects this is explicit: the CPWD requires a BIM Execution Plan as a contractual deliverable, precisely because BIM is a governed process, not a purchase.

Misconception check

We bought the BIM software, so now we are doing BIM.

The single most expensive misconception in the industry. Software is one tool inside one of BIM's three legs. Without the process — information requirements, a shared CDE, checking, handover — and the people — defined roles, collaboration, agreements — the software just produces 3D drawings nobody coordinated and data nobody can trust. BIM is a *method*, and a method is adopted, not purchased. The firms that 'tried BIM and it failed' almost always bought a leg and skipped the other two.
Try it

Do it yourself

Map a project you know (real or imagined) onto the three legs — you will be surprised how little of it is software.

  1. 1Draw three columns: Model, Process, People.
  2. 2Under Model, list what would be modelled (architecture, structure, services) and the key information each object should carry.
  3. 3Under Process, answer: who states the information requirements? Where is everything shared? Who checks it before it is trusted? How is it handed over at the end?
  4. 4Under People, list the roles: client/appointing party, lead coordinator, each task team, and who holds the BIM-manager and coordinator jobs.
  5. 5Now circle everything that is purely about the *software*. Notice how small that circle is compared with the other two columns — that ratio is the whole lesson.
Take this with you

The one line to carry out

BIM is a model, a process and people — and software is just one tool inside the process. You cannot buy BIM; you can buy a tool and then do the work of adopting a method. The firms that succeed invest in the process (requirements, a CDE, checking, handover) and the people (roles, collaboration, agreements) at least as much as the tools — and the firms that 'tried BIM and it failed' almost never did.
Related concepts in the glossary
Recap
BIM stands on three legs: model + process + people. The process is a managed information lifecycle (require → plan → produce in a CDE → check → hand over, per ISO 19650). The people make it collaborative and role-based. Software is one tool inside the process — the least decisive leg. You adopt BIM; you don't buy it.
Carry forward →

Forgetting that BIM is a method — not a model, not a brand — is the root of the myths that dog the field. Next: the big myths of BIM, cleared one by one.