Flooring Quality Checklist
Walk the site and tick what passed across delivery, laying and finish — ISI mark, calibre, shade, lippage, the hollow-tile tap test, adhesive, grout and silicone. Get a quality score out of 100, a verdict and a snag list to fix before you pay. Indicative India 2026 self-assessment.
Delivery
100% passedLaying
91% passedFinish
79% passedTick only what you have verified on site. Items are weighted by how much they affect a lasting floor — lippage, hollow tiles and adhesive coverage count most. This is an indicative self-assessment, not a tested or insurance-grade certification.
Flooring quality score
0/100
ExcellentA clean, code-aligned job. Close any last snags and sign off with confidence.
Score
93
out of 100
Checks passed
16/18
items ticked
Open snags
2
to fix
Percentage of weighted checks passed, by inspection stage.
Snag list — fix before payment
- 1Add expansion joints on large floors and a perimeter gap at walls — omitting them causes tenting/cracks. Laying
- 2Silicone the floor-wall and internal corners in wet areas — rigid grout there cracks and lets water in. Finish
Sort your snag list with DesignAI
Decide what to insist gets redone before you release the final payment.
Pairs with our on-site flooring inspection guide. Costs and codes are indicative for India 2026 and vary by city, brand and vendor.
Related Guides — Deep-dive reading
Flooring Quality Inspection in India: The On-Site QC & Snagging Checklist for Delivery, Laying and Handover (2026)
A homeowner's stage-by-stage flooring QC checklist with pass/fail criteria - what to inspect at material delivery, what to watch during laying, and how to snag the floor before you sign off.
Flooring & SurfacesBathroom Quality Inspection Checklist (India): Stage-Wise ITP with Hold Points & Tolerances
A copy-and-use Inspection & Test Plan (ITP) for Indian bathroom construction — the checks, acceptance criteria, hold and witness points and sign-offs at every stage from rough plumbing to final finish, plus a tolerances sheet and a defect-rating table your site engineer can lift straight into a snag sheet.
BathroomsBathroom Snag List Template (India): Room-by-Room Punch List for Pre-Handover Inspection
A copy-and-use bathroom snag list for Indian projects — a defect-capture register the architect, site engineer or homeowner fills in at pre-handover inspection, with a room-by-room prompt checklist, severity grading and a sign-off track so nothing gets closed until it is actually fixed.
BathroomsRelated Tools — You may also find these useful
Access Control Cost Estimator
Estimate per-door and whole-building access-control cost in India, with the full component breakdown and GST.
Cost EstimatorAccess Control ROI Calculator
Compare automated access control against guard and manual costs to find the saving and payback.
ROI CalculatorAccess Control System Designer
Design a door access-control system for your building and get the component BOM, topology and indicative cost.
System Designer