Door Handover Pack Generator

Door Handover Pack Generator

Enter your door count, whether you have fire doors or smart locks, and your warranty and DLP months — and get a ready handover checklist: O&M manual, warranties register, keys register, care instructions, defect-liability terms and fire-door certificates. Indicative India 2026 guidance.

Your project

The pack adapts to your inputs: fire-door certificate and smart-lock sections appear only when those counts are above zero. DLP in India is commonly 6–12 months — snags are rectified within it. This is a checklist aid, not a substitute for a qualified fitter or site engineer.

Handover pack items

0

across 8 sections · 12 doors · 2 fire · 1 smart

Sections

8

Items

35

to complete

DLP

12 mo

snag window

Items per handover section. Fire-door & smart-lock sections appear only when applicable.

Your door handover pack

Work top to bottom; tick each line as it is filed. Hand the client one bound (or PDF) pack.

01 · 5 items

Operation & maintenance (O&M) manual

How every door and lock works, plus the spec record.

  • Door schedule index covering all 12 doors (location, type, leaf, frame, finish)
  • Operation instructions for each ironmongery set (locks, levers, closers, bolts)
  • Manufacturer datasheets / IS 2202 (flush) & relevant product certificates
  • Adjustment notes — hinge tension, closer speed, latch alignment
  • Recommended periodic maintenance schedule (lubrication, tightening, inspection intervals)

02 · 4 items

Warranties register

Consolidated cover; you entered 12 months.

  • Warranty register listing each item, supplier, start date and 12-month expiry
  • Original supplier/manufacturer warranty cards & invoices (copies filed)
  • Workmanship guarantee from the carpenter/fitter for installation
  • Claim procedure & contacts for each manufacturer

03 · 4 items

Keys register

Full key control and handover record.

  • Keys register: number of keys cut per lock across 12 doors
  • Master / sub-master / keyed-alike groupings (if any)
  • Signed key-issue & return log (who holds which keys)
  • Cylinder/lock identifiers and re-keying instructions

04 · 4 items

Care & cleaning instructions

Day-to-day care to protect finish and function.

  • Cleaning method per finish (veneer, laminate, paint, PU, glass)
  • What to avoid (harsh solvents, abrasives, leaving doors wedged open)
  • Humidity/monsoon care — avoid swelling, keep weatherstrips intact
  • Routine checks: tighten screws, lubricate moving parts, clear thresholds

05 · 3 items

As-built records

What was actually installed, for future works.

  • As-built door schedule & hardware schedule (final, marked-up)
  • Snag/QA sign-off sheet (gaps, operation, finish accepted)
  • Photographic record of installed doors and any concealed fixings

06 · 4 items

Defect liability period (DLP) terms

Snag rectification window; you entered 12 months.

  • DLP statement: 12-month defect-liability window from handover date
  • Scope of covered defects (sticking, sagging, lock faults, finish defects) vs fair wear & tear
  • Defect-reporting procedure, response times and rectification process
  • Retention/snag-rectification note — Where any rectification or spares are billed, add 18% GST.

07 · 6 items

Fire-door certificates & compliance

Applies to 2 fire doors (NBC / IS 3614).

  • Fire-test certificates for the 2 fire-rated door sets (FD30/FD60, tested as a SET)
  • Installation compliance record — gaps ≤3mm (4mm max) around the leaf; threshold ≤8–10mm or sealed
  • Intumescent + smoke seal certificates and as-fitted confirmation
  • Confirmation of 3+ fire-rated hinges and a working self-closer per leaf
  • "Fire door keep shut" signage register and free-egress confirmation
  • Fire-door inspection & maintenance schedule (periodic re-checks)

08 · 5 items

Smart lock handover

Applies to 1 smart lock.

  • Admin credentials handed over, default/installer codes deleted
  • User guide: enrolling/removing PINs, cards, fingerprints, app users
  • Battery type, low-battery behaviour and mechanical override (key) instructions
  • Firmware/app account ownership transferred to the client
  • Access-control & fail-safe vs fail-secure note (must not block free egress)

Make the handover airtight

DesignAI reviews your pack for gaps — fire-door certificates, free-egress, keys control and DLP terms — so nothing is missed at handover.

Assumptions & notes

  • This generator builds a checklist, not legal documents — adapt the wording to your contract and local practice.
  • DLP (defect liability period) in India is commonly 6–12 months; snag rectification happens within it. Confirm the period and scope in your agreement.
  • Fire doors must be handed over with test certificates for the door set (FD30/FD60), gaps ≤3mm (4mm max) around the leaf, intumescent and smoke seals, 3+ fire-rated hinges, a working self-closer and “Fire door keep shut” signage (NBC / IS 3614), without obstructing free egress.
  • Smart locks must never block free egress; hand over admin credentials and delete installer defaults, and note the mechanical key override.
  • Indicative only — confirm the pack contents and any rectification with your carpenter/fitter on site. Where any rectification or spares are billed, add 18% GST.