Documentation Studio
Two things designers redo on every project: schedules and written documents. Build a door & window schedule and export it as PDF or CSV, then use ready-made AI prompts to draft specs, scope of work, site reports and snag lists in your own assistant.
| Mark | Type | W (mm) | H (mm) | Nos | Area m² | Material / spec | Location | |
|---|---|---|---|---|---|---|---|---|
| 8.40 | ||||||||
| 3.36 | ||||||||
| 5.76 | ||||||||
| 0.54 |
Sizes in millimetres (Indian convention). A working schedule — verify every opening against your GFC drawings and site measurements before fabrication.
How it works
Add doors, windows and ventilators with marks, sizes (mm), counts, material and location. Areas and totals compute as you type — export a clean schedule as PDF or CSV.
Ready-made prompts turn a few notes into a specification, scope of work, site-visit report, snag list or BOQ preamble — in your own AI assistant. Nothing is sent to us; it costs you nothing here.
Every schedule exports as a tidy document. It is a working aid — verify openings against your GFC drawings, and have a professional review any AI-drafted text before it goes out.
Related Guides — Deep-dive reading
The Architect & Designer's Curtain Specification Guide (India 2026)
How a professional specs window treatments — the soft-furnishing schedule, false-ceiling pockets and pelmets, motor wiring points, fabric allowances, trade coordination, client sign-off and the BOQ lines that make or break a handover.
Window TreatmentsBathroom Specification Template (India): Materials, Workmanship & Approved-Equivalent Clauses
A copy-and-use bathroom specification template for Indian projects — the materials schedule, the method-of-execution table and the sample-approval clauses that make a contractor price and build exactly what was designed, not a cheaper look-alike.
BathroomsBathroom Snag List Template (India): Room-by-Room Punch List for Pre-Handover Inspection
A copy-and-use bathroom snag list for Indian projects — a defect-capture register the architect, site engineer or homeowner fills in at pre-handover inspection, with a room-by-room prompt checklist, severity grading and a sign-off track so nothing gets closed until it is actually fixed.
BathroomsRelated Tools — You may also find these useful
Handover Punch List
Room-by-room defect tracker for final handover with severity, owner, and close-out date.
Punch ListAccess Control Cost Estimator
Estimate per-door and whole-building access-control cost in India, with the full component breakdown and GST.
Cost EstimatorAccess Control ROI Calculator
Compare automated access control against guard and manual costs to find the saving and payback.
ROI Calculator