Prefab, Modular & DfMA
Mastery check · Module 5
Grids, Tolerance & Connections
10 questions · pass mark 70%. Answer each, check it, and see where you stand before moving on.
Question 1 of 10
Single answer
Why does off-site construction depend on dimensional coordination in a way that site-built construction can largely avoid?
A
Because factories use metric units and sites use imperial ones
B
Because a factory makes parts to fixed dimensions in advance and cannot reconcile imprecision in place the way site trades do, so parts must be designed to fit before they are made
C
Because off-site construction is always cheaper and cost control requires coordination
D
Because building codes require a grid only for modular buildings
Check answer
Feedback