Load path
The continuous route every load must travel to reach the ground — slab to beam to column to foundation to soil. Break it anywhere (remove a column, cut a beam) and the building fails at that point.
The continuous route every load must travel to reach the ground — slab to beam to column to foundation to soil. Break it anywhere (remove a column, cut a beam) and the building fails at that point.